When Southern Cross cable operator began initial deployments connecting Australia and New Zealand with the West Coast of the United States in 2000, Southern Cross’ optical network was running 2.5 Gb/s wavelengths with a maximum total transmission capacity of 240 Gb/s over two cables. Today, Southern Cross is working with Ciena to realize a network that's even more adaptive, with enhanced programmability, scale, automation, and intelligence.
ACG Research: Southern Cross Submarine Network Transformation
Related
View more insightsWebinars
Translating industry best practices into positive policy and regulatory outcomes with Ciena, Meta, AWS and TeleGeography
This webinar will detail the ICC’s strategic, multifaceted efforts in education, outreach, and advocacy, which build upon the International Cable Protection Committee’s (ICPC) best practices. Attendees will learn how sustained collaboration
WatchBlog
Ciena and Meta achieve world record 800 Gb/s across 16,608 km on transpacific submarine cable
As AI-driven demand accelerates, Ciena and Meta have set a new world record — achieving unregenerated single carrier 800 Gb/s across a transpacific submarine cable spanning 16,608 kilometers from Singapore to California. Powered by Ciena’s
ReadVideos
Automated Deployment Optimizer
Accelerate time to market and revenue for submarine and terrestrial networks with Automated Deployment Optimizer (ADO), included with Navigator Network Control Suite™.
Watch


